Updates from Irvington: round-up
Just wanted to formally announce a few items of note. First off, the Pennsy Trail has been paved and is now only awaiting a trailhead (I think) before it would be ready for opening. When I stopped by to take some photos there were already a few travelers using it, so the populace is ready for sure.


Next up, the Audubon Court renovations are complete and the majority of units have already been rented. The finished results are excellent based on what I've seen so far. IDO has written up an article on the renovation.




A new transit option is available for the Eastside. The Near Eastside Orbiter (NEO) travels an hourly route between the 10th street corridor, downtown, E.Washington Street, and Irvington. I hope it works out, but I honestly have no idea how it will be received. At the very least it is a good experiment. From the website link:



Next up, the Audubon Court renovations are complete and the majority of units have already been rented. The finished results are excellent based on what I've seen so far. IDO has written up an article on the renovation.




A new transit option is available for the Eastside. The Near Eastside Orbiter (NEO) travels an hourly route between the 10th street corridor, downtown, E.Washington Street, and Irvington. I hope it works out, but I honestly have no idea how it will be received. At the very least it is a good experiment. From the website link:
The Near Eastside Orbiter (NEO) is a circular shuttle which provides transportation for residents of the near eastside community. The shuttle fills the gaps of current Indygo service as a way for individuals to have access to not only the downtown loop, but to also connect them to jobs, shopping and recreational in the neighborhood.

Labels: Irvington, Pennsy Trail


0 Comments:
Post a Comment
<< Home