There has been a lot of work going in Irvington in the past year or so. I’ve managed to photograph some of it, figured I would post here to show people that things are progressing along just fine. First on the list is the Pennsy trail.

The Pennsy trail (see original post here) is under construction, I took some construction photos during the nice weather this past week. This phase of construction will link Arlington to Shortridge along the old Pennsylvania railroad line.


Looks like they are stripping the original tracks down a significant amount and re-building the roadway. Should be very good quality and long lasting pathway. Judging from how deep my footprints went, they need to add and compact a bit more soil before they are done.

I was very happy to be able to get to the old rail bridge across Shadeland. This bridge is essential to the success of the trail, because there would be no way to get across a limited access freeway like Shadeland otherwise. A big benefit of this project is that the no-man’s-land in between Shadeland and I-465 is now accessible by pedestrians. Thus, I can now ride my bike to Applebee’s or K-Mart without risking a busy street crossing.




Soon, the trail will be extended to Ritter on the West and underneath the I-465 highway on the East. With a bit of luck, the state will continue its plans to extend to trail to Cumberland, Greenfield, and eventually all the way to Ohio. But the longest journeys start with a single step.

This entry is filed under green design, infrastructure, Irvington, midwest, Pennsy Trail, Urban Environment. You can follow any responses to this entry through RSS 2.0. You can leave a response, or trackback from your own site.

1 Response to “Updates from Irvington – Pennsy Trail”


  1. Anonymous

    Thanks Graeme,
    I commute from the Eastgate area to Beechgrove nearly 7 days a week with my bike and cross the Pennsy Trail on Kitley. I have been noticing the work and its very nice to see all the preperation and work thats gone into it so far. I can’t wait for the opening and more to come. Thanks for the pictures and your observations.
    Bill